SFI: Setting up and tracking actions
Farmwalk tracks the actions in your issued SFI agreement, their land assignments, evidence and related work.
Set up the agreement
Open Schemes. For a PDF, choose Add Scheme > Upload agreements. For manual entry, choose Add Scheme > Add Scheme, then select SFI in the builder. Check references, dates, offer year, action codes and enrolled areas against the source before saving.
The optional SFI Planner is for planning and comparing prospective actions. It is separately enabled and is not required for tracking an existing agreement.
Work with actions
Open Actions and select a code. Check the relevant parcels or whole-farm scope, and record year-specific rotational placements where required. Capital or declaration controls appear where applicable.
Evidence and compliance
Choose the correct agreement year and inspect each action's required evidence types. Displayed evidence progress counts linked types, not the raw file number. Action-card progress can include submitted files, while checklist ticks use approved evidence plus manual fulfilment; re-scoring SFI for another selected year uses that year's approved files. Review the surface, record approval and evidence-link approval rather than assuming every indicator uses the same calculation. A record that is Awaiting approval or Not approved cannot be linked and is excluded from evidence counts and reports. Where the farm requires approval, an owner, consultant or manager with the required access reviews the record first. Ordinary farm-page links to an approved record start approved automatically; buyer-scheme or other review-required links can still need a separate decision. Manual fulfilled ticks are not year-specific.
Owners and consultants can manage supported farm, action and business-wide requirement settings under Manage organisation > Evidence. On the agreement's Actions tab, expand an action's checklist and click its requirement badge to set Required, Optional or Not required for this farm's action only. Choosing Not required asks you to Stop tracking; organisation Evidence settings remain the place for business-wide changes. These settings change the tracker, not official SFI obligations.
Use the exact action rules to decide whether soil analysis, a management plan, photos or other records are needed. There is no blanket annual laboratory-testing requirement for every soil-focused action. Review missing evidence, generated tasks and declarations before submitting through your official process.
Ending an evidence year
In the agreement's Evidence tab, End Year is offered for the current unarchived year. Review the period, pending evidence and declaration choice before choosing Archive Year. If declaration checks are outstanding, complete the displayed checks and retry; cancelling them leaves the year unarchived. Wait for confirmation and verify the year's archived state. Archiving evidence does not approve pending files or submit a declaration to the authority.
