ROC records land or site condition for works such as wayleaves, easements and developer access. It is an optional organisation module. Its records can support a claim or review, but do not guarantee a legal outcome.
Set up on the web
Open ROC in the organisation menu.
Create a works record and assign it to a farm or project.
Enter its name, agreement type and relevant details. Set the review cadence to One-off, Monthly or Quarterly as appropriate.
Create a Baseline, Interim or Handback inspection with the correct inspection date.
Open the draft inspection to capture or add observations.
Works statuses include Active, On hold, Completed and Cancelled. Web observation kinds include Photo pin, Damage area, Concern, Measurement and Note. Use the actual capture and map controls offered rather than assuming a click anywhere creates every kind.
Capture on iOS
Open the farm's Record of Condition works list, or the relevant project's works.
Select an existing draft inspection and tap Capture for this inspection where offered.
Use the photo camera, photo-library picker or voice/audio mode when available.
Review location warnings. A photo without a location can be saved with confirmation, but will not be pinned on the site plan.
Check the upload queue and inspect the saved evidence on the web.
Where your installed version and access offer them, project screens also provide New works and New inspection. Enter the works name and agreement type, then create a Baseline, Interim or Handback inspection with its date and optional summary. Confirm the saved result before capturing. Native ROC does not provide the web's full working-area editing, submission or report-generation interface. Submitted inspections are closed to new photos. Voice capture depends on the inspection's vault scope. In a draft project inspection, tap a saved photo or voice-note observation to view it. Use Delete and confirm only if it should be removed from the inspection, then check the result. Submitted inspections do not offer deletion; if submission happened while the media sheet was open, the app reports that nothing was deleted.
Submit on the web
Review the observations and pending uploads, then click Submit and confirm Submit inspection. While submitted, the inspection is read-only. For a genuinely later visit, start another inspection. To correct an unfinished or mistaken submission, an owner, consultant or the inspection's creator with continuing write access can choose Revert to draft where offered and confirm it. Reopening keeps observations, photos and details, increases the revision and marks existing finished inspection reports superseded. Make the correction, submit again and generate and check an up-to-date report instead of circulating an older superseded one. This is the web correction workflow; native submitted screens may remain read-only.
Project drawings on the web
In a project's Areas tab, upload up to 20 drawings at once: DXF, GeoJSON or shapefiles, including a ZIP or matching loose sidecars. A drawing is capped at 25 MB. DWG is refused. Check the placement preview and warnings, including any partial-placement confirmation, before attaching. Each drawing is handled separately and can have its own colour. Use the layers controls to manage it. Do not assume every CAD symbol, curve or coordinate system imports correctly.
Reports on the web
Use the works/report controls to generate an inspection report or select visits for a works evidence pack. Word export and report branding are offered in the relevant report/project workflow; branding requires a separate administrator-granted add-on. Available ROC format settings include photo layout, captions, grid sizing and Direction arrows. Turn arrows off if they crowd the photo-location map; numbered location pins remain. Check generated files and photo locations before sending them. The organisation ROC overview also offers estate packs spanning selected works/farms. A queued or failed pack is not a completed report.
Before relying on the record
Capture the baseline before works start where possible, and record its actual date.
Check locations, captions and original evidence rather than assuming GPS is always available.
Web link opening in iOS depends on external Apple association/capability deployment, which this source review does not verify.
Edit one report on the web
Open a generated report and choose Design where offered. Adjust its margins, included sections, photo layout and sizing, captions, descriptions, notes and photo order. Supported inspection reports also offer visit-summary edits. Choose Apply and regenerate, wait and check the result before downloading. These choices belong to this report: they do not rewrite the inspection observations, project or organisation branding. ROC continues to use its project's permitted brand rather than a per-report brand picker.
